PROJECT DETAILS
Client: | Mr. Sikwese |
---|---|
PROJECT SCOPE | Structural Engineering Design, Design of Storm-water and Foul-water drainage system, Engineering Specification and Civil Works Design. |
Location: | Blantyre, Malawi |
CONSTRUCTION CONTRACT PERIOD: | 24 Months |
CONTRACT SUM: | MWK 125,000,000.00 |
PROJECT STATUS: | - |